Bushfire hazard assessment
Understanding the risk. Informing better decisions.
A clear understanding of bushfire hazards is fundamental to effective planning, development and risk management.

Blackash provides detailed bushfire hazard assessments that identify potential exposure, evaluate site-specific conditions and establish the technical evidence needed to inform planning and development decisions.
Our assessments bring clarity to complex environments, helping clients understand the risks, the regulatory requirements and the options available.
Evidence-led bushfire assessment
Bushfire risk is influenced by more than a property’s proximity to vegetation. Typography, vegetation type, surrounding land use, development design and access arrangements can all affect how a site may be exposed to bushfire.
Blackash evaluates these factors within the relevant planning and regulatory frameworks, providing a sound technical basis for development proposals and bushfire protection strategies.
Frequently asked questions
Understanding bushfire risk and what it means for your property, project or organisation isn’t always straightforward. Here, we answer some of the questions we’re most often asked and provide a clear starting point for navigating the issues. Visit our FAQs page for more.
Bushfire-prone land is land that has been identified as potentially exposed to bushfire risk. In NSW, bushfire-prone land is identified through Bush Fire Prone Land mapping prepared by local councils and certified by the NSW Rural Fire Service. Being on bushfire-prone land does not necessarily mean development cannot occur. It means bushfire risk and the relevant planning and building requirements need to be considered as part of the development process.
An Asset Protection Zone, or APZ, is an area between a building or asset and a bushfire hazard that is managed to reduce potential exposure to bushfire. The required dimensions and management of an APZ depend on factors including the site, vegetation, slope, type of development and applicable planning requirements.
Yes. Bushfire due diligence can help identify potential risks, planning constraints and development implications before significant financial or design commitments are made.
This can be particularly valuable for developers, investors, organisations and landowners considering sites in bushfire-prone areas.
Ideally, bushfire considerations should be assessed early in the planning and design process. Early advice can identify constraints and opportunities before significant decisions are made, allowing bushfire requirements to be considered alongside planning, architecture, engineering and other project requirements.
A Bushfire Hazard Assessment Report assesses the bushfire risk affecting a proposed development and considers how the development responds to applicable bushfire planning requirements. Depending on the project, this may include consideration of vegetation, slope, bushfire attack, Asset Protection Zones, access, water supply, construction requirements and other measures for managing bushfire risk.
Yes. Bushfire requirements can influence building location, site layout, access, landscaping, vegetation management, construction standards, water supply and other elements of a development. Considering these requirements early can provide greater flexibility and reduce the likelihood of significant redesign later in the approval process.







